Data as follows:
|
|
|
Type of conveyor:
|
Matador Class 1000 3 ply 5/2.5
|
|
Conveyor speed:
|
1.8 m/s
|
|
Conveyor loading:
|
between 100 and 380 t/hour
|
|
Material conveyed:
|
Chrome ore and waste rock
|
|
Lump size:
|
60% fines and 40% 50mm to 400mm
|
|
Material SG:
|
3.8 - 4.2
|
|
Operating hours:
|
14 - 16 Hours per day 5 days per week
|
|
Tons conveyed:
|
273,000 (Total test period)
|
|
Testing: |
|
|
The Outer diameters of all the idlers were
precisely measured and recorded. The idlers were then put into
commissioned simultaneously and were subjected to the same operating
conditions during the duration of the test period.
|
|
Important observations: |
|
|
Physical inspection indicated that the steel idlers shell joints wee
clearly visible with an uneven surface pattern alongside the joints.
This indicate that the joint areas were initially protruding beyond the
specified circumference of the idler diameter, resulting in excessive wear
in this area. I am of the opinion that the steel idler would
prematurely fail at the shell joints, assuming no other (bearings, etc.)
failure occur first.
The "YeloRoll" indicated no visual abnormal bearing, shaft or
end cap arrangement wear or abnormal condition. This aspect can only
be assessed after a more extensive test period. |
|
Contact:
|
|
|
Ruben Geyer |
Production Engineer WC
|
|
Tel / Fax:
|
0145746099
|
|
E-Mail:
|
ruben.geyer@samancor.co.za
|
|
Address:
|
Western Chrome Mines
Mooinooi
P.O. Box 245
0325
|
|
Report compiled by:
|
Signature on original
document 23/5
R. B. Geyer
|
|
Head of Department:
|
Signature on original
document
D. F. Botha
Engineering Manager WCM |